A603 Road Works and Maintenance
Work to fill and repair the 211 defects on the A603 (Cambridge Road) between the M11 and Barton layby should have been completed last night. CCC Streetworks and Barton PC pressured Openreach to repair the collapsed manhole at the New Road/A603 junction at the same time. The temporary traffic lights have been removed.
Please continue to report defects such as pot holes and blocked drains on CCC Highways Report a Fault page. Feel free to contact Barton PC directly if faults are not fixed in a timely manner and will we do our best to push for repairs.
